Friday, May 27, 2016

Pavement Resurfacing to Continue

Work Completed Last week, May 23rd to May 27th
·         Underground utility improvements consisting of storm sewer installation or repair
o   Near intersection of Central Road and Shermer Road
o   Kiess Drive
o   Norwood Terrace
o   Harrison Street
o   Imperial Drive
o   Executive Lane
o   Longmeadow Drive
·         Asphalt driveway replacement / repair (if impacted due to construction operations)
o   Kiess Drive
o   Harrison Street
o   Covert Road
o   Imperial Drive
o   Executive Lane
o   Longmeadow Drive
·         Complete concrete replacement along:
o   Near intersection of Central Road and Shermer Road
o   Kiess Drive
o   Norwood Terrace
o   Imperial Drive
o   Executive Lane
o   Longmeadow Drive

Work anticipated to be completed Next week, May 30th to June 3rd
·         Asphalt pavement removal and replacement along:
o   Castle Drive (south of Springdale Avenue)
o   Knollwood Lane ( west of Pfingsten Road)
o   Norwood Terrace
o   Harrison Street
o   MARS patches at Harrison Street, Covert Road, and Primrose Lane

Thank you to all the residents along the project sites that have had periodic work along their streets or experienced extended time out of their driveways due to unforeseen circumstances or project scheduling. Now that the majority of the storm sewer improvements are completed, the concrete that was previously removed is anticipated to be replaced by the end of the week.

In several areas, the now that the concrete and storm sewer improvements are completed, the roadway resurfacing can begin. In a few areas, additional concrete replacement needs to be performed on the opposite side of the street. For these residents, the remaining concrete work is scheduled to be completed within the next few weeks prior to the roadway resurfacing beginning.

No work will be performed on-site over the holiday weekend.

Have a fun and safe Memorial Day!!!